Exteriors, grounds and lighting

  • Campuswide: Building identification and wayfinding sign installation as part of multiyear Campus Identity Plan.
  • East community (Celani, Emmons, Fabiano, Herrig, Saxe and Woldt halls): Lighting upgrades, east side of lots 46 and 47 and northeast of Herrig. Sidewalks accessible, through Aug. 9.
  • Graduate Housing Complex: Masonry repair to East Building main entrance. Intermittent balcony closure and sidewalk blockage, through Aug. 9.
  • Lot 22: Lighting, south end, through Aug. 9.
  • Moore Hall: Door replacement, north and south entrances on east and west sides. Intermittent closures, through Aug. 9.
  • North community (Calkins, Larzelere, Robinson and Trout halls): Residence halls and Hopkins Court closed for improvements to infrastructure, interiors and exteriors. Perimeter sidewalk open, through Aug. 9.
  • Northwest Apartments: New lighting along east side sidewalk, connector to Bellows Street. Partial closures, through Aug. 9.
  • Park Library: Roof restoration, through Aug. 9. Sidewalk repair northeast to south. Periodic sidewalk closures and posted alternate routes along Preston Street to west of Lot 27, June 3-Aug. 9.
  • Roof maintenance: Inspections, maintenance and repairs to campus building roofs as needed, through Aug. 9.
  • Rose Center and Ryan Hall: Roof replacement, May 6-Aug. 9. Masonry restoration at pool walls, through Aug. 9.
  • Rowe Hall: Sidewalk replacement at south entrance. Short-term closures, June 3-Aug. 9.
  • South community (Beddow, Merrill, Sweeney and Thorpe halls): Lighting upgrades south of Thorpe, sidewalks accessible, through Aug. 9. Sidewalk repair south of Lot 37. Sidewalk closed, alternate route posted, June 3-Aug. 9.
  • South Grounds: Rain radar installation, through Aug. 9.
  • Student Activity Center: Wall repair, west wall to southwest corner, through Aug. 9.
  • Warriner Hall: Masonry restoration on north and southeast elevations. Work area fenced, overhead scaffolding, covered walkways. Sidewalks open, circle drive closed, through Aug. 9.
  • Wightman Hall: Masonry restoration, east and west elevation. Work area fenced, overhead scaffolding, covered walkways, through Aug. 9.