  • Bovee University Center: CMU Bookstore flooring work; work area and loading dock closed, May 5-24. Fountain repair and flooring; work area contained, through Aug. 9. Down Under Food Court; sewer repair, isolated water outages, through May 31.
  • CART Research Labs: Air handler replacement, northeast corner closed, through Aug. 9. Room 102 fume hood installation, room closed, through Aug. 9. Server Room (139) closed, through Aug. 9.
  • Center for Integrated Health Studies: Ongoing construction through November 2019.
  • Dow Science Complex: Room 205 remodel, room closed, May 21-June 17. Room 231 lighting upgrade, partial closure, through May 17. Drainage repair, third floor, isolated room closures, through Aug. 9.
  • East community (Celani, Emmons, Fabiano, Herrig, Saxe and Woldt halls): Lighting upgrades, east side of lots 46 and 47 and northeast of Herrig. Sidewalks accessible, through Aug. 9. Woldt and Emmons flooring work. Periodic closures, June 4-18 (Woldt) and June 19-July 5 (Emmons). Woldt food station remodeling, dining area closed, June 3-July 12. Woldt and Emmons interior painting, periodic stairwell closures, through Aug. 9. Woldt Market, Woldt and Saxe lobbies access control, through Aug. 9.
  • Graduate Housing Complex: Masonry repair to East Building main entrance. Intermittent balcony closure and sidewalk blockage, through Aug. 9.
  • Grawn Hall: Flooring work, classrooms 212, 213, 301, 342 and third-floor suite hallways, June 24-Aug. 1.
  • Health Professions Building: Refresh of rooms 1251-1252 (June 24-Aug. 9), rooms closed. Lighting replacement, Atrium, work area contained, through Aug. 9.
  • Moore Hall: Door replacement, north and south entrances on east and west sides. Intermittent closures, through Aug. 9. Student Services Center, rooms 221F, 221G, 231 closed, through Aug. 9. Room 133 renovation, work area contained, through May 18.
  • North community (Calkins, Larzelere, Robinson and Trout halls): Residence halls and Hopkins Court closed for improvements to infrastructure, interiors and exteriors. Perimeter sidewalk open, through Aug. 9.
  • Northwest Apartments: New lighting along east side sidewalk, connector to Bellows Street. Partial closures, through Aug. 9.
  • Parking lots:
    • Lot 10: Parking lot repair. Sidewalk closed between University Art Gallery and Lot 10, through May 12.
    • Lot 15: Closed as part of Barnes Hall decommissioning project, through Aug. 22.
    • Lot 22: North end construction staging, through Aug. 9. South end lighting, through Aug. 9.
    • Lot 44: Reconstruction. Lot closed, June 4-July 26.
    • Striping: Tuesdays-Fridays 6 a.m.-4:30 p.m. and off-peak hours as needed, periodic partial closures, through Aug. 9.
  • Park Library: Roof restoration, through Aug. 9. Booster replacement, complete water shutdown, May 6-10. Third-floor Group Study, work area sectioned off, through Aug. 9. Door work, through Aug. 9.
  • Pearce Hall: Rooms 323-324A remodeling, rooms closed, through Aug. 9.
  • Powers Hall: Mechanical improvements, southwest section of first and second floors closed and offline, Barnes Kitchen closed, through Aug. 9.
  • Rose Center and Ryan Hall: Roof replacement, through Aug. 9. Masonry restoration at pool walls, through Aug. 9. Flooring work, classrooms 102/103 and Physical Education and Sport Office (rooms 174-197 and hallway 173A), July 8-26.
  • Sidewalks and drives:
    • Park Library sidewalk repair: Northeast to south. Periodic sidewalk closures and posted alternate routes along Preston Street to west of Lot 27, June 3-Aug. 9.
    • Rowe Hall sidewalk replacement at south entrance: Short-term closures, June 3-Aug. 9.
    • Warriner Hall circle drive: Closed for Warriner masonry restoration, through Aug. 9.
    • South community (Beddow, Merrill, Sweeney and Thorpe halls): Sidewalk repair south of Lot 37. Sidewalk closed, alternate route posted, June 3-Aug. 9.
  • South community (Beddow, Merrill, Sweeney and Thorpe halls): Lighting upgrades south of Thorpe, sidewalks accessible, through Aug. 9. Access control, four interior cross-corridor doors, through Aug. 9.
  • South Grounds: Rain radar installation, through Aug. 9.
  • Student Activity Center: Wall repair, west wall to southwest corner, through Aug. 9. Wood floor replacement, McGuirk Arena (July 22-31); and LSF, SSF and room 134 (Aug. 2-11). Work areas not accessible.
  • The Towers (Carey, Campbell, Cobb, Kesseler, Kulhavi, Troutman and Wheeler halls): Kesseler Hall flooring work (through Aug.1) and interior painting (through Aug. 9). Periodic access closures.
  • Warriner Hall: Masonry restoration on north and southeast elevations. Work area fenced, overhead scaffolding, covered walkways. Sidewalks open, circle drive closed, May 6-Aug. 9. Room 103 renovation, room closed through May 27. Rooms 108, 110 and 112 renovation, rooms closed through Aug. 9.
  • Wightman Hall: Masonry restoration, east and west elevation. Work area fenced, overhead scaffolding, covered walkways, through Aug. 9.