  • Bovee University Center: Fountain repair, work area contained, through Aug. 9.
  • CART Research Labs: Air handler replacement, northeast corner closed, through Aug. 9. Room 102 fume hood installation, room closed, through Aug. 9. Server Room (139) closed, through Aug. 9.
  • Chippewa Champions Alumni Center: New construction and temporary facilities, through September 2020.
  • East community (Celani, Emmons, Fabiano, Herrig, Saxe and Woldt halls): Woldt and Emmons make-up air, work areas contained, through Aug. 9. Woldt and Emmons interior painting, periodic stairwell closures, through Aug. 9. Woldt Market, Woldt and Saxe lobbies access control, through Aug. 9.
  • Graduate Housing Complex: Masonry repair to East Building main entrance. Intermittent balcony closure and sidewalk blockage, through Aug. 9.
  • Grawn Hall: Flooring work, classrooms 212, 213, 301, 342 and third-floor suite hallways, through Aug. 1.
  • Health Professions Building: Refresh of rooms 1251-1252 (through Aug. 9), rooms closed. Lighting replacement, Atrium, work area contained, through Aug. 9.
  • Health Professions Building expansion: Ongoing construction including Center for Intergrated Health Studies through November 2019.
  • Kelly/Shorts Stadium: Video board installation, south end of stadium. Part of Tower Drive and Lot 63E closed through June 30.
  • Margo Jonker Stadium: Infield replacement, through Aug. 9.
  • Moore Hall: Door replacement, north and south entrances on east and west sides. Intermittent closures, through Aug. 9. Student Services Center, rooms 221F, 221G, 231 closed, through Aug. 9.

  • North community (Calkins, Larzelere, Robinson and Trout halls): Residence halls and Hopkins Court closed for improvements to infrastructure, interiors and exteriors. Perimeter sidewalk open, through Aug. 9.
  • Northwest Apartments: New lighting along east side sidewalk, connector to Bellows Street. Partial closures, through Aug. 9.
  • Parking lots:
    • Lot 15: Closed as part of Barnes Hall decommissioning project, through Aug. 22.
    • Lot 16: Access only through south entrance off Preston Street, through Aug. 9.
    • Lot 22: Construction staging at north end, through Aug. 9.
    • Lot 32: Construction staging, through Aug. 9.
    • Lot 44: Reconstruction. Lot closed, through July 26.
    • Warriner Hall circle drive: Closed for Warriner masonry restoration, through Aug. 9.
    • Parking lot striping: Tuesdays-Fridays 6 a.m.-4:30 p.m. and off-peak hours as needed, periodic partial closures, through Aug. 9.
  • Park Library: Roof restoration, through Aug. 8. Third-floor Group Study, work area sectioned off, through Aug. 9. Door work, through Aug. 9.
  • Pearce Hall: Rooms 323-324A remodeling, rooms closed, through Aug. 9.
  • Powers Hall: Mechanical improvements, southwest section of first and second floors closed and offline, Barnes Kitchen closed, through Aug. 9.
  • Rose Center and Ryan Hall: Roof replacement, through Aug. 9. Masonry restoration at pool walls, through Aug. 9. Flooring work, classrooms 102/103 and Physical Education and Sport Office (rooms 174-197 and hallway 173A), through July 18.
  • Sidewalks and drives:
    • Park Library sidewalk repair: Northeast to south. Periodic sidewalk closures and posted alternate routes along Preston Street to west of Lot 27, through Aug. 9.
    • Rowe Hall sidewalk replacement at south entrance: Short-term closures, July 15-Aug. 9.
    • Warriner Hall circle drive: Closed for Warriner masonry restoration, through Aug. 9.
    • South community (Beddow, Merrill, Sweeney and Thorpe halls): Sidewalk repair south of Lot 37. Sidewalk closed, alternate route posted, through July 26. Access control, four interior cross-corridor doors, through Aug. 9.
  • South community (Beddow, Merrill, Sweeney and Thorpe halls): Lighting upgrades south of Thorpe, sidewalks accessible, through Aug. 9. Access control, four interior cross-corridor doors, through Aug. 9.
  • South Grounds: Rain radar installation, through Aug. 9.
  • Student Activity Center: Wall repair, west wall to southwest corner, through July 31. Wood floor replacement, McGuirk Arena (July 22-Aug.2); and LSF, SSF and room 134 (Aug. 3-11). Work areas not accessible.
  • The Towers (Carey, Campbell, Cobb, Kesseler, Kulhavi, Troutman and Wheeler halls): Kesseler Hall flooring work (through July 22) and interior painting (through Aug. 9). Periodic access closures.
  • Warriner Hall: Masonry restoration on north and southeast elevations. Work area fenced, overhead scaffolding, covered walkways. Sidewalks open, circle drive closed, through Aug. 9. Rooms 108, 110 and 112 renovation, rooms closed through Aug. 9.
  • Wightman Hall: Masonry restoration, east and west elevation. Work area fenced, overhead scaffolding, covered walkways, through Aug. 9.